In 2010 Blakeman Plumbing & Heating, Inc. installed plumbing & HVAC, including rerouting the 8” storm drains, for the addition to the Ashland High School in Ashland, WI.

In 2011 Blakeman Plumbing & Heating, Inc. performed utility upgrades for the Apostle Islands Marina in Bayfield, WI. Work consisted of replacing the water lines under the docks.

ApostleIsMarina Bayfield Marina

In 2009 Blakeman Plumbing & Heating, Inc installed the plumbing and HVAC systems in the new Arbys Restaurant in Ashland, WI.

AHU IMG_20170412_132210256 New Location1

IMG_0876 IMG_0878 IMG_1126 IMG_2333

In 2009 Blakeman Plumbing & Heating, Inc. installed new air lines for the mechanical shop at Ashland Ford in Ashland, WI.

 

In the fall of 2014 Blakeman Plumbing & Heating, Inc. performed ventilation upgrades, with work consisting of installing one new air handling unit, four new roof top exhaust fans, and replacing various sections of duct. They also relocated an existing air handling unit.

Cover IMG_0732 IMG_0733 IMG_0813 IMG_7941 yes

IMG_4269 IMG_4270 IMG_4352 IMG_4361

In 2007 Blakeman Plumbing & Heating, Inc. updated plumbing and HVAC in 44 homes.

Blakeman Plumbing & Heating, Inc. remodeled the HVAC system during the 2014 5,000 square foot remodel at the Barron High School. Work consisted of demolition and installation of new duct and hydronic piping, a new air handling unit, new variable air volume boxes, a new unit heater, new exhaust fans and a new convector.

IMG_0172 IMG_0176 IMG_0178 IMG_0179 IMG_0182 photo 2

In 2014, the Bayfield County Highway Department added a new 2,700 square foot heated storage building at their Mason location. BPH installed the in floor heating system with a boiler and heat recovery ventilator along with a trench drain and catch basin.

IMG_0305 IMG_0306 IMG_0530 IMG_0531 IMG_0601 IMG_0603 IMG_6986 IMG_6987 photo 3 photo 4 qf qfw

2015. The new headquarters facility for Bayfield Electric Cooperative consists of 9,900 square feet of offices, 7,500 square feet of warehouse, and 16,300 square feet of vehicle storage. Blakeman Plumbing & Heating, Inc. installed a geothermal heating and cooling system made up of WaterFurnace water to water and water to air heat pumps with forced air and in floor heat.

Bayfield Electric Coop 1 2 3 4 5 6 7 8 11 12 13 14 15 16 17 18 19

The new 16,400 square foot community center was built in 2013-2014. The HVAC system consisted of AC units, make-up air units, furnaces, humidifiers, zone dampers, electric wall, ceiling and duct heaters, electric baseboard, in-line exhaust fans, ceiling exhaust fans, and a range hood with roof exhaust.

027 028 029 033 phdd photo

IMG_20150211_093414216 IMG_0808 IMG_0809 IMG_0810 IMG_20150211_093319541 photo 3 IMG_0807 Butternut

In 2007 Blakeman Plumbing & Heating, Inc. installed geothermal heating and cooling at the Cable Museum in Cable, WI.
There were many wells bored for this system

During the spring and summer of 2014 the Chequamegon Food Coop remodeled the interior and exterior of their new building to accommodate a new food store with a deli, classroom, and office space. Blakeman Plumbing and Heating, Inc. updated the HVAC system by installing new duct, grilles, registers, diffusers, exhaust fans, air conditioning and furnaces. They also restructured the plumbing by installing new sanitary and domestic water piping, gas piping, and fixtures.

CheqFoodCoop IMG_0172 IMG_0309 IMG_0513 IMG_20140729_091648_858 new 006 new 007 New 013 P3190062 snj (2)

In 2012 Blakeman Plumbing and Heating, Inc. installed plumbing and HVAC at the Copper Lake School in Irma, WI. As this is in a prison, the work was completed under high security conditions.

 

copper_lk 1340374102416 1340374130296 1340374140976 1340374150372

center IMG_7395 IMG_7936

Built in the winter of 2014-2015 in Ashland, Wisconsin, the Culver’s restaurant hosts a variety of different HVAC equipment installed by Blakeman Plumbing & Heating, Inc. This 4,000 square foot building has two Lennox roof top units, five Accurex exhaust fans, exhaust hoods, a condensate hood and an electric ceiling heater.

culvers IMG_0748 IMG_0750 IMG_0819 IMG_0820

Dollar Tree – Ashland, WI
Blakeman Plumbing & Heating, Inc. replaced the plumbing and HVAC system during the 2013 remodel of the 11,350 square foot building in Ashland, WI. New ductwork, grilles, registers and diffusers were installed. Also installed was new waste and vent piping and new plumbing fixtures.

In 2013, Blakeman Plumbing & Heating, Inc. installed the HVAC system in the retail space at the Oakwood Mall in Eau Claire, WI.

In 2006 Blakeman Plumbing & Heating, Inc. installed the plumbing and HVAC in the new restaurant on Highway 2 in Ashland, WI.

In 2013 the Frederic Care Center added 4,700 square feet onto their existing building in Frederic, Wisconsin. Blakeman Plumbing and Heating, Inc. installed multiple packaged terminal air conditioning units, new exhaust fans, a Renewaire energy recovery ventilator, electric duct heaters, and a blower coil unit.

kljshv 030 kljshv 033 kljshv 036 kljshv 037

Blakeman Plumbing and Heating, Inc installed the plumbing and HVAC in the Gast Office Building, built in 2011-2012 in Ashland, WI.

This 3,116 square foot building was completed in the fall of 2013. Blakeman Plumbing & Heating, Inc. installed plumbing and HVAC.

0815131332a 1021131513a 1021131514a kljshv 024 kljshv 025

During the winter of 2014-2015 Hayward Marine added a new 11,500 square foot building for sales, offices and a showroom. The 20 ton closed loop geothermal heating and cooling system, installed by Blakeman Plumbing & Heating, Inc., consists of two WaterFurnace heat pumps, one buffer tank, one air handler, and in-floor heat with multiple zones.

Hayward Marine Cover IMG_0397 IMG_0399

In 2012 Blakeman Plumbing & Heating installed plumbing and HVAC in the Apartment complex in Mosinee, WI.

cover boiler (1) boiler (2) boiler (3) image 1 2 3 4 5

In 2009 Blakeman Plumbing & Heating, Inc. installed the plumbing and HVAC at the Jimmy Johns restaurant in River Falls, WI.

During the winter of 2013-2014 Jump River Electric Cooperative built a new 11,000 square foot office/warehouse. Blakeman Plumbing and Heating, Inc. installed a complete plumbing system with catch basins, trench drains, a holding tank, sanitary piping, gas piping, water piping, a water heater, water closets, lavatories and an electric water cooler.

Jump River Cover 018 IMG_5299 IMG_5301 IMG_5302 IMG_5303 IMG_5306 IMG_5307 IMG_5309 kjcfh 008 P2130050 P2130051 P2130054 P2130058 P2130060 P2130061 P2130062 P2130065 kjcfh 009 kjcfh 010

In 2012, Blakeman Plumbing & Heating, Inc. installed the HVAC system and gas piping at the Ladysmith Industrial Center in Ladysmith, WI.

2012-06-20_12-47-54_345 2012-06-20_12-48-45_800

In 2003, Blakeman Plumbing & Heating, Inc. installed the plumbing and HVAC in the new fire hall in Marengo, WI.

In 2009 Blakeman Plumbing & Heating, Inc. installed the plumbing and HVAC in the medical center in Hayward, WI.

20160830_201910030_iOS (2) IMG_0674 (2) IMG_0681 (2) IMG_0699 (2)

In 2010 Blakeman Plumbing & Heating, Inc. installed the HVAC in the medical center in Phillips, WI.

2012-09-07_17-02-10_395 2012-09-13_07-48-03_867 2012-09-13_08-42-00_330

2012-09-07_17-02-10_395 2012-09-13_07-48-03_867 2012-09-13_08-42-00_330

In 2012 Blakeman Plumbing & Heating, Inc installed the plumbing during the NATC University Transfer Center Remodel in Rhinelander, WI.

20161230_204922038_iOS (2) IMG_0765 (2) IMG_0785 (2) IMG_0786 (2) nctc

In 2010 Blakeman Plumbing & Heating, Inc. installed the plumbing in the new fire hall in South Range, WI.

0513131834a 0620131149a

P82A0141 0612130817a 0812131251a IMG_4165

In 2012 Blakeman Plumbing & Heating, Inc. installed the HVAC at the Place on the Lake Condos in Ashland, WI.

The Port Wing Fire Department added a new 5,600 square foot building during the fall and winter of 2013. Blakeman Plumbing and Heating, Inc. installed a complete plumbing and HVAC system. A variety of plumbing fixtures were installed, including a sink, urinal, utility sink, water heater, mop sink, shower, catch basin, trench drains, water closets, lavatories, floor drains and wall hydrants. The HVAC system consisted of a boiler, in-floor heat, make-up air unit, energy recovery unit and exhaust fans.

new_firehall-1024x608 0129141017a 0826131433a 0910131203 1123130037a aw db dgb gder image xcbc (1)

In 2013 Blakeman Plumbing & Heating, Inc. installed the plumbing & HVAC for the Red Cliff multi-family housing units in Red Cliff, WI.  

1108121234a 1108121307a 1108121428a 1115121102c 1115121102d

Throughout the summer of 2014, a four classroom, 7300 square foot, second story addition and 9,800 square foot gymnasium and storage addition was added to the Rice Lake Middle School. Blakeman Plumbing & Heating, Inc. installed two new Daikin roof top units, cabinet unit heaters, variable air volume boxes, roof intake and ventilators, a split system air conditioning unit, a unit heater and exhaust fans.

PC040058 PC040053 - Copy (2) PC040053 - Copy PC040053 PC040054 - Copy (2) PC040054 - Copy PC040054 PC040057 - Copy (2) PC040057 - Copy PC040058 - Copy (2) PC040058 - Copy PC040059 - Copy PC040059 PC040061 - Copy PC040061 PC040062 PC040063 - Copy (2)

In 2009 Blakeman Plumbing & Heating, Inc. installed the plumbing in the 80 unit hotel in River Falls, WI.

Cover River Falls 008 River Falls 010 River Falls 011

In 2007 Blakeman Plumbing & Heating, Inc installed the plumbing and HVAC in the Schoolhouse Condos in Bayfield, WI.

In 2009 Blakeman Plumbing & Heating, Inc. installed the plumbing and HVAC at the new Shell gas station/convenience store/car wash in Ashland, WI.

George R. Field South Fork Suites is a four-story, suite style residence hall which houses 240 students.

SoForks 0731121612a 0731121614a 0731121614b 0731121617a 2012-02-28_16-57-16_114 2012-02-28_17-07-33_134 image river falls 002 river falls 004 river falls 006 River falls 045 River falls 048 river falls suites 007 riverfalls 2 026

In 2012 Blakeman Plumbing and Heating, Inc. did HVAC renovations on Ag Center in Spooner, WI.