­

Blakeman Plumbing & Heating, Inc. remodeled the HVAC system during the 2014 5,000 square foot remodel at the Barron High School. Work consisted of demolition and installation of new duct and hydronic piping, a new air handling unit, new variable air volume boxes, a new unit heater, new exhaust fans and a new convector.

IMG_0172 IMG_0176 IMG_0178 IMG_0179 IMG_0182 photo 2

­