er 715-682-6050  

Proudly serving northern WI and surrounding areas since 1995.

In 2010 Blakeman Plumbing & Heating, Inc. installed plumbing & HVAC, including rerouting the 8” storm drains, for the addition to the Ashland High School in Ashland, WI.

In 2011 Blakeman Plumbing & Heating, Inc. performed utility upgrades for the Apostle Islands Marina in Bayfield, WI. Work consisted of replacing the water lines under the docks.

In 2009 Blakeman Plumbing & Heating, Inc installed the plumbing and HVAC systems in the new Arbys Restaurant in Ashland, WI.

In 2009 Blakeman Plumbing & Heating, Inc. installed new air lines for the mechanical shop at Ashland Ford in Ashland, WI.

 

In the fall of 2014 Blakeman Plumbing & Heating, Inc. performed ventilation upgrades, with work consisting of installing one new air handling unit, four new roof top exhaust fans, and replacing various sections of duct. They also relocated an existing air handling unit.

In 2007 Blakeman Plumbing & Heating, Inc. updated plumbing and HVAC in 44 homes.

Blakeman Plumbing & Heating, Inc. remodeled the HVAC system during the 2014 5,000 square foot remodel at the Barron High School. Work consisted of demolition and installation of new duct and hydronic piping, a new air handling unit, new variable air volume boxes, a new unit heater, new exhaust fans and a new convector.

In 2014, the Bayfield County Highway Department added a new 2,700 square foot heated storage building at their Mason location. BPH installed the in floor heating system with a boiler and heat recovery ventilator along with a trench drain and catch basin.

2015. The new headquarters facility for Bayfield Electric Cooperative consists of 9,900 square feet of offices, 7,500 square feet of warehouse, and 16,300 square feet of vehicle storage. Blakeman Plumbing & Heating, Inc. installed a geothermal heating and cooling system made up of WaterFurnace water to water and water to air heat pumps with forced air and in floor heat.

The new 16,400 square foot community center was built in 2013-2014. The HVAC system consisted of AC units, make-up air units, furnaces, humidifiers, zone dampers, electric wall, ceiling and duct heaters, electric baseboard, in-line exhaust fans, ceiling exhaust fans, and a range hood with roof exhaust.

In 2007 Blakeman Plumbing & Heating, Inc. installed geothermal heating and cooling at the Cable Museum in Cable, WI.
There were many wells bored for this system

During the spring and summer of 2014 the Chequamegon Food Coop remodeled the interior and exterior of their new building to accommodate a new food store with a deli, classroom, and office space. Blakeman Plumbing and Heating, Inc. updated the HVAC system by installing new duct, grilles, registers, diffusers, exhaust fans, air conditioning and furnaces. They also restructured the plumbing by installing new sanitary and domestic water piping, gas piping, and fixtures.

In 2012 Blakeman Plumbing and Heating, Inc. installed plumbing and HVAC at the Copper Lake School in Irma, WI. As this is in a prison, the work was completed under high security conditions.

 

Built in the winter of 2014-2015 in Ashland, Wisconsin, the Culver’s restaurant hosts a variety of different HVAC equipment installed by Blakeman Plumbing & Heating, Inc. This 4,000 square foot building has two Lennox roof top units, five Accurex exhaust fans, exhaust hoods, a condensate hood and an electric ceiling heater.

Dollar Tree – Ashland, WI
Blakeman Plumbing & Heating, Inc. replaced the plumbing and HVAC system during the 2013 remodel of the 11,350 square foot building in Ashland, WI. New ductwork, grilles, registers and diffusers were installed. Also installed was new waste and vent piping and new plumbing fixtures.

In 2013, Blakeman Plumbing & Heating, Inc. installed the HVAC system in the retail space at the Oakwood Mall in Eau Claire, WI.

In 2006 Blakeman Plumbing & Heating, Inc. installed the plumbing and HVAC in the new restaurant on Highway 2 in Ashland, WI.

In 2013 the Frederic Care Center added 4,700 square feet onto their existing building in Frederic, Wisconsin. Blakeman Plumbing and Heating, Inc. installed multiple packaged terminal air conditioning units, new exhaust fans, a Renewaire energy recovery ventilator, electric duct heaters, and a blower coil unit.

Blakeman Plumbing and Heating, Inc installed the plumbing and HVAC in the Gast Office Building, built in 2011-2012 in Ashland, WI.

This 3,116 square foot building was completed in the fall of 2013. Blakeman Plumbing & Heating, Inc. installed plumbing and HVAC.

During the winter of 2014-2015 Hayward Marine added a new 11,500 square foot building for sales, offices and a showroom. The 20 ton closed loop geothermal heating and cooling system, installed by Blakeman Plumbing & Heating, Inc., consists of two WaterFurnace heat pumps, one buffer tank, one air handler, and in-floor heat with multiple zones.

In 2012 Blakeman Plumbing & Heating installed plumbing and HVAC in the Apartment complex in Mosinee, WI.

In 2009 Blakeman Plumbing & Heating, Inc. installed the plumbing and HVAC at the Jimmy Johns restaurant in River Falls, WI.

During the winter of 2013-2014 Jump River Electric Cooperative built a new 11,000 square foot office/warehouse. Blakeman Plumbing and Heating, Inc. installed a complete plumbing system with catch basins, trench drains, a holding tank, sanitary piping, gas piping, water piping, a water heater, water closets, lavatories and an electric water cooler.

In 2012, Blakeman Plumbing & Heating, Inc. installed the HVAC system and gas piping at the Ladysmith Industrial Center in Ladysmith, WI.

In 2003, Blakeman Plumbing & Heating, Inc. installed the plumbing and HVAC in the new fire hall in Marengo, WI.

In 2009 Blakeman Plumbing & Heating, Inc. installed the plumbing and HVAC in the medical center in Hayward, WI.

In 2010 Blakeman Plumbing & Heating, Inc. installed the HVAC in the medical center in Phillips, WI.

In 2012 Blakeman Plumbing & Heating, Inc installed the plumbing during the NATC University Transfer Center Remodel in Rhinelander, WI.

In 2010 Blakeman Plumbing & Heating, Inc. installed the plumbing in the new fire hall in South Range, WI.

In 2012 Blakeman Plumbing & Heating, Inc. installed the HVAC at the Place on the Lake Condos in Ashland, WI.

The Port Wing Fire Department added a new 5,600 square foot building during the fall and winter of 2013. Blakeman Plumbing and Heating, Inc. installed a complete plumbing and HVAC system. A variety of plumbing fixtures were installed, including a sink, urinal, utility sink, water heater, mop sink, shower, catch basin, trench drains, water closets, lavatories, floor drains and wall hydrants. The HVAC system consisted of a boiler, in-floor heat, make-up air unit, energy recovery unit and exhaust fans.

In 2013 Blakeman Plumbing & Heating, Inc. installed the plumbing & HVAC for the Red Cliff multi-family housing units in Red Cliff, WI.  

Throughout the summer of 2014, a four classroom, 7300 square foot, second story addition and 9,800 square foot gymnasium and storage addition was added to the Rice Lake Middle School. Blakeman Plumbing & Heating, Inc. installed two new Daikin roof top units, cabinet unit heaters, variable air volume boxes, roof intake and ventilators, a split system air conditioning unit, a unit heater and exhaust fans.

In 2009 Blakeman Plumbing & Heating, Inc. installed the plumbing in the 80 unit hotel in River Falls, WI.

In 2007 Blakeman Plumbing & Heating, Inc installed the plumbing and HVAC in the Schoolhouse Condos in Bayfield, WI.

In 2009 Blakeman Plumbing & Heating, Inc. installed the plumbing and HVAC at the new Shell gas station/convenience store/car wash in Ashland, WI.

George R. Field South Fork Suites is a four-story, suite style residence hall which houses 240 students.

In 2012 Blakeman Plumbing and Heating, Inc. did HVAC renovations on Ag Center in Spooner, WI.

­